Walker's Research Business Information
A publisher of Business Information since 1983  
  
 
Search Business Search Executive   Advanced Search
 
Sign In  |  Hints

Profile of Robert Butler
 

Robert Butler

 
Field Services Regional Mgr. - Bedford, TX, Engineer - Environmental Business Solutions
 
Robert Butler Email :
Please login
 
Company Name : Environmental Business Solutions
 
Company Website : www.ebsenvironmental.com
 
Company Address : 3900 Kilroy Airport Way
Ste. 100, Long Beach, CA,
United States,
 
Robert Butler Profile :
Field Services Regional Mgr. - Bedford, TX, Engineer - Environmental Business Solutions
 
Robert Butler Biography :

EDUCATION

B.S., Construction Management, Louisiana State University, 1984

CERTIFICATIONS

OSHA 40 Hour Hazwoper Training, 1986

Qualified Party for Louisiana Contractors License Landfill Gas and Leachate Collection Systems

Qualified Party for Louisiana Contractors License Synthetic Liners

Qualified Party for Louisiana Contractors License Hazardous Waste and Site Remediation

Qualified Party for Louisiana Contractors License Heavy Construction

PROFESSIONAL EXPERIENCE

Mr. Butler has over twenty years experience in estimating, scheduling, quality control and management in Industrial, Hazardous Waste Remediation and Methane Gas Recovery construction. Clients include the Hoechst Celanese, Albemarle, Georgia Gulf, Shell Chemical, Exxon, Waste Management, Republic, Allied/Browning Ferris Industries and Various Public Agencies.

City of East Baton Rouge Devils Swamp Landfill, Baton Rouge, LA Managed the construction of a complete landfill gas / condensate management system consisting of installation of forty-two gas extraction wells, hooking up eleven existing gas vents, installation of over 35,000 feet of 2 18 HDPE header, lateral, condensate and air lines, modifications to an existing wet well and furnishing, installation of five condensate sumps with air pumps and installation of a skid mounted blower flare system.

Entergy Corporation - Lake Charles, LA Managed the construction of an engineered cap over an existing tar pit. Project involved removing existing materials, installation of geotextile and geo-grid system and reinstalling existing and new materials required for proper drainage.

BFI Livingston Landfill Pontiac, IL Managed the installation of forty-two new wellhead assemblies, installation of over 12500 feet of 4’ through 16 header/lateral lines and connection to an electric generating facility.

WMI Coastal Plains RDF, Alvin, TS Managed the installation of twenty-five new gas extraction wells, below ground wellheads and installation of over 14,500’ of header/laterals and forcemain. Project also included installation of condensate knockout sumps and pumps and modifications to existing blower / flare station.

BFI Little Dixie Landfill, Jackson, MS Managed the installation of twenty-three LFG vertical extraction wells, one dual contained sump, two single contained sumps, three air pumps, installation of over 4000 feet of 2 through 12 HDPE Header / Lateral lines, modifications to existing blower building and installation of an enclosed flare system

WMI Tri-County Landfill, South Elgin, IL, WMI Closed Sites Managed the installation of forty-four LFG extraction wells, installation of over 12,500 feet of HDPE piping from 2 6, four condensate knockouts with air pumps and one complete skid mounted blower/flare/compressor package system.

Rio Rico Landfill, Rio Rico, AZ Managed the installation of eight migration wells along the perimeter of the landfill, installation of over 2000 feet of above ground PVC header pipe and a skid mounted flare system.

WMI Covel Gardens Landfill, San Antonio, TX Managed the installation of approximately 2000 feet of 4HDPE forcemain, HDPE manholes, pumps, valves and flow meters.

Fairhaven Sanitary Landfill, Fairhaven, MA Managed the installation of 4500 feet of horizontal gas collection trenches, installation of twenty-four gas extraction wells and twelve solar powered gas flares.

31st Street Landfill, Chicago, IL Managed the installation of 27000 feet of 414 Header and lateral piping, 68 drip traps, one hundred thirty-eight wellhead assemblies and a complete blower flare station. Flare was an enclosed flare.

BFI Davis Junction Landfill, Davis Junction, IL Managed the installation of 19000 feet of 2 10 Header and Laterals, twenty combination leachate/gas wells, eight leachate wells, three sumps with air pumps and odification to existing tank farm, including 3 x 6 & 2 x 4 dual contained piping.

WMI Pecan Grove Landfill, Pass Christian, MS Managed the installation of 4 10 Header and lateral piping and installation of twelve new wells.

Georgia Gulf Corporation, Port Allen, LA Managed the cleanup activities for the Tri-Mustine Waste Cleanup. Project involved Level B waste segregation and packaging activities, macro encapsulation of waste materials, landfill disposal, fuels blending and incineration services.

Hoechst Celanese In Plant Service Account Managed all in plant remediation and disposal activities for plants in Pasadena, TX and Rock hill, SC.

Albemarle Corporation Managed all Waste Stream activities for the Pasadena, TX facility as part of a negotiated regional agreement.

 
Robert Butler Colleagues :
Name Title Email


            Home  |  About Us  |  Product Information   |  Subscription  |  List Builder   |  Executive List   |  Email Lists   |  Contact Us  |  Site Map  |  Browse Directory   
 

© 2009, Walkers's Research - A publisher of Business Information since 1983, All Rights Reserved.